Friday, September 28

I am away today attending a session by Pixar. I hope everyone has a good weekend.

Block A – Video & Film

  • PSA Post-Production
  • Due at the start of class on Monday, October 1

Block B – Computers 8

  • Computer Master Question
  • Computer Cartography Wiki

Block C – Video & Film

  • PSA Post-Production
  • PSA’s due at the start of class on Monday, October 1

Block D – ICT 11/12

  • Continue “Design Problems”
  • Students can work at own pace through the material, submitting completed work through the Moodle.

Thursday, September 27

Block A – Video & Film

  • PSA Post-Production
  • Due at the start of class on Monday, October 1

Block B – Computers 8

  • Time to polish logos and applications
  • Logo Presentations

Block C – Video & Film

  • PSA Post-Production / Terry Fox Run
  • PSA’s due at the start of class on Monday, October 1

Block D – ICT 11/12

  • Continue “Design Problems”
  • Students can work at own pace through the material, submitting completed work through the Moodle.

Wednesday, September 26

Block A – Video & Film

  • PSA Production / Post-Production

Block B – Computers 8

  • Work on logo applications (putting your logo on various objects)
  • Mr. Powell to demo distort tool.

Block C – Video & Film

  • PSA Production / Post-Production

Block D – ICT 11/12

  • Continue “Design Problems”
  • Students can work at own pace through the material, submitting completed work through the Moodle.

Tuesday, September 25

I am sick today. I came down with a cold and hope to rest up for Wednesday. If you have any pressing concerns, please email me at powell@mrpowellsclass.com. I will most likely check my email several times throughout the day.

Block A – Video & Film

  • Please watch the Adobe Premiere introduction videos (linked on Moodle, last item under PSA)
  • Try editing some stock video clips
  • Work on the PSA project will resume tomorrow. Mr. Powell will go over editing on Wednesday and you will have all of Thursday and Friday to edit as well. Due Monday, October 1.

Block B – Computers 8

  • Work on the two finalist designs (must be done on the computer)
  • Once the two finalists are done, you may have a client meeting to determine which logo will be the final logo.
  • Make any changes to the final logo based on feedback from the client.

Block C – Video & Film

  • Please watch the Adobe Premiere introduction videos (linked on Moodle, last item under PSA)
  • Try editing some stock video clips
  • Work on the PSA project will resume tomorrow. Mr. Powell will go over editing on Wednesday and you will have all of Thursday and Friday to edit as well. Due Monday, October 1.
  • Note: Project extension due to Terry Fox run on Thursday taking up the entire block. Your project will be due Monday, October 1st.

Block D – ICT 11/12

  • Continue desktop background activity if not complete
  • Those that are done can begin working on the “Design Problems”
  • Students can work at own pace through the material, submitting completed work through the Moodle.

Friday, September 21

Block A – Video & Film

  • PSA Production
  • Groups may film if script and storyboard are done and approved by Mr. Powell

Block B – Computers 8

  • Meet with client for the first part of class, discuss draft logo designs. Get feedback on what logos they like and why.
  • Continue working on drafts / begin working on two finalists

Block C – Video & Film

  • PSA Production
  • Groups may film if script and storyboard are done and approved by Mr. Powell

Block D – ICT 11/12

  • Photoshop activity
  • “Teaching to See” video